Manually Energizing Power Systems after an Unplanned Outage: An Alberta Electric Utility Best Practice

*** New occupational health and safety laws came into effect on June 1, 2018. The OHS resource below may not have been updated to reflect the current legislation. For more information on the new requirements, visit OHS changes.***

The purpose of this Best Practice is to standardize, to the extent possible, the minimum steps that an electric utility must include in its own practices for manually energizing a power system after an unplanned outage.
SKU: GS008
Keywords